Energy / Heavy Lift

Independent marine warranty approval for a 420-tonne module load-out

Before loading a 420-tonne process module onto a barge, we independently verified the lift plan and tied the operation to safe conditions.

Independent marine warranty approval for a 420-tonne module load-out
420 t Module weight lifted
0 Equipment damage / injury
100% Independent plan verification

Challenge

A 420-tonne process module was scheduled to be loaded onto a barge. Before the operation, an independent verification of the lift plan was requested.

Solution

We carried out the lift-plan review, crane-capacity check, certification check of the rigging equipment, ground-bearing-pressure calculations, weather-limitation analysis and risk assessment.

Result

The operation was carried out safely. No equipment damage or personnel injury occurred.